Business Kit

Print any sheet, or print the whole kit to PDF. These are business templates: fill in your own numbers, reword the letters into your voice.BackflowPrep is independent career and study information. It is not affiliated with, endorsed by, or sponsored by ASSE International, the ABPA, or any certifying body, water authority or licensing agency. ASSE and certification designations are the property of their respective owners and are used only to identify the credentials this material describes. Certification requirements and local acceptance vary by jurisdiction and change: confirm current requirements with an ASSE Accredited School and your water authority before enrolling or testing. Researched from published sources, not professional advice.

Test Visit Field Log

The on-site record you fill at the assembly: identification, location, readings, result, tag and follow-up in one pass, so the office report writes itself.

DateCustomer / siteAssembly locationAssembly ID / serialSize and typeGauge IDInitial reading(s)Pass / FailRepairs madeRetest resultTag numberSubmitted to authority (date)
            
            
            
            
            
            
            
            
            
            
            
            

Assembly Inventory Sheet

One row per assembly per site. The first thing to build for a new commercial customer, and the document that makes you their permanent tester.

SiteAssembly locationTypeSizeSerialHazard it isolatesAuthority account #Last test dateNext test dueNotes
          
          
          
          
          
          
          
          
          
          
          
          
          
          

Customer Route Ledger

The repeat-revenue engine on paper: who is due when, so no annual test ever leaves your route by silence.

CustomerSite addressAssemblies (count)Test month (typical)Last testedReminder sentBookedCompletedReport filed
         
         
         
         
         
         
         
         
         
         
         
         
         
         
         
         

Gauge Calibration Log

Documented gauge accuracy is commonly required by authorities. This log keeps the paper trail in one place: gauge, date, by whom, certificate reference.

Gauge ID / serialCalibration datePerformed byCertificate #Next dueNotes
      
      
      
      
      
      
      
      
      
      

The Three-Year and One-Year Clock

Two clocks run this trade: your credential every three years, your customers typically every one. This planner counts both backward so neither surprises you.

Clock one: your credential (every 3 years)

T minus 6 moEarliest recertification date. ASSE allows recertifying up to six months early without losing time. Book the class here if the season allows.
T minus 4 moClass booked? Gauge calibration current and documented for the practical?
T minus 3 moBench practice for the practical: setup, sequence, recording, at working speed.
T minus 1 moLast safe window. If the class is not booked by now, you are gambling your route against a schedule you do not control.
ExpiryA lapsed card means no legal tests, which means every customer on the route is available to whoever answers the phone instead.

Clock two: the customer year

Due minus 8 wkReminder letter or call goes out (template in this kit).
Due minus 4 wkUnbooked customers get the second touch. Silence is how routes leak.
Test dayField log filled at the assembly, tag hung, repair conversation had on site if it failed.
Due plus 1 wkReport filed with the authority, ledger updated, next-due date written down. The row is not done until this line is.

Job Pricing Factors Worksheet

No numbers included on purpose: yours are yours. The worksheet walks every factor that should be priced before you quote: drive time, assembly count, access, repair likelihood, admin per authority, seasonality.

New Water Authority Onboarding Checklist

Every authority runs its program a little differently. Work this checklist once per authority and file it; the answers are your operating manual for that territory.

Customer Outreach Templates

Three short letters in plain professional language: the annual-test reminder, the failed-assembly repair follow-up, and the new-property introduction. Reword them into your voice.

Annual test reminder

Subject: Backflow test due at [address]

Your backflow prevention assembly at [address] is due for its periodic test required by [water authority]. Last year's test was completed on [date]. I can schedule the visit the week of [window]; most tests take under an hour and I file the report with the authority for you. Reply or call to pick a time.

Failed assembly follow-up

Subject: Repair needed at [address], report filed

The assembly at [location] did not pass its test on [date]. I have filed the required report and the authority allows a repair-and-retest window. I can complete the repair and retest in one visit on [date option]; parts for your assembly type are stocked. Repair and retest together resolve the notice before it escalates.

New property introduction

Subject: Backflow testing for [property]

I am a certified backflow tester working with [water authority] accounts in [area]. Properties like yours typically have assemblies on [likely systems]. If you are not certain of your test status, I can inventory the assemblies, confirm due dates with the authority, and put the property on a schedule so notices never reach you.